Sale
Sale
Sale
Sale
Sale
Sale

Vertical Chemical Pump for Electroplating Processing



Save -56% Rs. 128,749.01 Rs. 289,685.28

Shanvis

7015883013089_115181553

9999 In Stock Sold Out 9999 9999 9999 9999 9999 9999


HURRY ! ONLY 9999 LEFT IN STOCK.

Type
Maximum Head
Maximum Flow Rate
Notify Me


Payment & Security
Payment methods
  • PayPal
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
Security
FREE SHIPPING
WORLDWIDE
BIG SAVING ON
WEEKENDS
24H SUPPORT
CONTACT US

_p1Vertical Chemical Dosing Pump for Electroplating Processing

Product Characterist

_p21. the injection molding of frpp / PVDF plastic material can be used for most chemical liquids and acid - base; 

2. suitable for various acid and alkali liquid circulation, cooling, spray washing equipment, waste gas tower, etching machine, electroless plating, no electrolytic nickel and other special occasions

3. the pump uses dry shaft seal, can be used for idle operation, idling will not damage the motor, the pump body has the design of oil seal, ensure that acid gas will not easily enter the motor shaft, so as to protect the motor and prolong the service life of the motor

4. the motor shaft is made of sus and titanium shaft, directly from the inside of the motor through the special process to ensure the concentricity and durability of the normal work. 

5. unique channel design, high pressure, high efficiency, low noise, no leakage, easy maintenance;  6. it is suitable for the installation and use in the groove / groove, and can also be used with the filter;

 

Product analysis

PT – 40 – VK – 1 – 5 – N – F

 1        2    3      4     5    6    7

 

1.Model:PT

 

2.In-Outlet Size: 20-3/4”  25-1”  32-1-1/4”  40-1-1/2”

 

3.Specific Weight :VK-1.1  VP-1.4

 

4. Power 1/15, 1/8, 1/6, 1/4, 1/3, 1/2, 1, 2, 3HP

 

5. Frequency :5-50Hz  6-60Hz

 

6. Rubber Material :N-NBR  E-EPDM  V-VITON

 

7. Pump Material :F-PP+GF  C-CPVC  K-PVDF

 PT-1

PT.jpg

 

Product display

_p5

 

 

Product features

_p6_p7

 

Other products

_p8 

Certificate showing

111 

Workshop show

_p9 gg4

1, the use of PP+GF, CPVC, PVDF, all kinds of plastic material injection molding, can resist most of the chemical, acid, alkali resistance
2, suitable for all kinds of acid and alkali liquid cooling, spraying and washing equipment, waste gas tower, carving machine, waste water treatment and so on
3, controllable operation, never by air instead of damage
4 dry seal design, can protect the motor to prevent acid gas into the damaged bearing
5 it is suitable for the cyclic transportation of electroless nickel, electroless copper and various special electroplating liquid
6 , explosion-proof motor can be used according to the environment

 

 FAQ

Q: How to customize the product?
A: Generally speaking, when customers provide us with application data
sheet, we will select the appropriate product and seal type and send the
drawings to us; We specialize in OEM and ODM;

 

Q: What is the minimum order quantity?
A: 1;

 

Q: What if the image doesn't match the product attributes?
A: Although we try our best, sometimes the pictures provided by the
manufacturer may be slightly different from the product list. For the
most accurate information about these products, see product properties.
If you have any other questions, please feel free to contact us.

 

Q: What is your payment term?
A: Once pi / sales contract is confirmed, 30% deposit T / T, the balance
will be paid after inspection and before delivery; Or L / C at sight;

 

Q: How long is the warranty period?
A: 1 year;

 

Q: How long is the production lead time?
A: 7-10 days;

 

Q: What is your delivery time?
A: We can arrange the goods according to your needs. We will arrange the
urgent production for the urgent goods, which can be delivered within 7
days at the latest

 

Q: Where do you ship from?
A: According to the needs of customers, we will ship goods from any port
in China. If there is no designated port, we will default to Shanghai
port

 

Q: How many days will it take to receive my items?
A: Daikin's stock is usually delivered within one to three working days.
Depending on your location, you should receive your items within 5-10
working days.

 

Q: What if I receive the damaged goods?
A: We would rather this never happen, but if it does, please contact us
via Alibaba news. We will arrange a full refund or exchange, and provide
you with return instructions.

 

Q: Who is in charge of after sales service?
A: We have a professional after-sales service department, which can
provide customers with some good suggestions and solutions within 24
hours after receiving the email;

 

Q: Can I get a discount if I order more?
A: We only sell goods at the price they are on the shelves. We promote
the lowest possible price on all products. If you buy 1 or 1000 items,
you will still receive the same excellent price!

Click here to get the lowest price

home

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.

H3c18bb9f2a3f4ab7858509a36b37f5f89.jpg
Vertical Chemical...
Save -56% Rs. 128,749.01 Rs. 289,685.28